Skip to content

title: MM-Cron: sprint 2 design (1–14 Nov 2026) component: MM-Cron level: iteration status: draft 1 (25 Oct) owner: MMDEP Design (Claude) phase: mm-cron/phase-1.md (MC-1, MC-2)


MM-Cron: sprint 2

Sprint goal: the adapter framework works (MC-1, 7 Nov), and the top 15 AMCs' portfolio disclosures plus AMFI NAV daily and TER run through it (MC-2, 14 Nov). Until the ingest routes exist, output goes to the file target.

Queue step LLD Owner Status
Sonnet T0c: adapter framework LLD-adapter-framework.md design: Claude (high risk); build: Sonnet (items 1–7); registry and move: API agent (8, 12); first adapters: harness (9–11) draft, ready to build
Lane S S5: direct-database-access inventory single document, no LLD needed API agent queued
Lane S S6: fund details for all AMCs; AMFI factsheet links (#64) superseded by the framework LLD plus TD-054 (AMFI first for TER and AUM). S6 now covers the registry URLs and the AMFI TER job API agent queue updated
AMFI completion (setup doc §2 (2)) LLD-amfi-jobs.md design: Claude (medium); preflight: API agent (item 1); jobs: harness (items 2–8) draft; NAV daily and TER in S2, the rest in S3

Sprint-2 exit check (14 Nov): 15/51 portfolio adapters merged with passing fixtures; framework moved into mm-crons with green CI; AMFI NAV daily and TER producing run records on the file target daily on the laptop runner.