Last checked: 2026-10-25 01:45 IST (PROCEED; control snapshot 2026-10-24 23:46 IST).

Evidence rule: mark a step done only when its runs/<step>.md result or merged deliverable is verified. Searches of MMDEP's indexed default-branch content did not find the current run-result files; that does not prove they are absent from owning project repositories. States below reflect evidence accessible to this assistant.

Queue Step Owner Status Evidence / next action
Sonnet S2 T0 — unstarve harness MMDEP Assistant (#155) in progress Verified and closed #104, #106, #112, #114, #116, #127, #133, #137, #143 against merged PRs into integration/sprint-2. Remaining: seed 10 ready low-risk issues; harness still skips review/blocked items. Queue-status page merged in PR #160.
Sonnet S2 T0b — B42 model roles and per-model limits Sonnet not started No T0b run result found; T0 is not complete.
Sonnet S2 T0c — MM-Cron adapter framework Sonnet / MM-Cron not started No T0c run result found.
Sonnet S2 T1 — NAV data-quality checker Sonnet not started No T1 run result found; collector reports duplicates and a 10-day gap.
Sonnet S2 T2 — Lighthouse CI Sonnet / MWMC not started No T2 run result found.
Sonnet S2 T3 — API contract tests Sonnet not started No T3 run result found.
Sonnet S2 T4 — crawler onward-link and CTA checks Sonnet / MWMC not started No T4 run result found.
Sonnet S2 T5 — sprint metrics Sonnet not started No T5 run result found.
API Lane P S2 P1 — write-route security enforcement LLD API Lane P not started Queue begins 26 Oct; no P1 run result found. Production/high-risk actions remain gated.
API Lane P S2 P2 — NAV duplicate root cause and design API Lane P / Claude review not started No P2 run result found; high-risk design review required before build.
API Lane P S2 P3 — production health/category release candidate API Lane P not started No P3 run result found; Atul approval required before release.
API Lane P S2 P4 — fund-factsheet API contract API Lane P / MWMC not started No P4 run result found.
API Lane S S2 S1 — classify API/MM-Cron open MRs API Lane S not started No docs/relay/api-lane-s/runs/S1.md found in indexed MMDEP content. Collector snapshot lists 23 API and 22 MM-Cron MRs.
API Lane S S2 S2 — staging data-load plan and one-scheme proof API Lane S not started No S2 run result found; staging catalogue currently reports one record.
API Lane S S2 S3 — staging index NAV 404 and NFO 500 API Lane S not started No S3 run result found.
API Lane S S2 S4 — OpenAPI draft API Lane S not started No S4 run result found.
API Lane S S2 S5 — direct database access inventory API Lane S not started No S5 run result found.
API Lane S S2 S6 — AMC fund details and factsheet LLD API Lane S not started No S6 run result found.
MWMC S2 M1 — classify site URL inventory MWMC not started No docs/relay/mwmc/runs/M1.md found in indexed MMDEP content.
MWMC S2 M2 — turn SEO audit findings into issues MWMC not started No M2 run result found.
MWMC S2 M3 — page-type test plan MWMC not started No M3 run result found.
MWMC S2 M4 — first fund-factsheet page spec MWMC not started No M4 run result found; depends on API Lane P P4 contract.

Nudges

  • Sonnet / harness: finish T0 (#155) by seeding 10 ready low-risk issues after the verified merged-PR issues are closed; do not treat review-state work as ready.
  • API Lane S: publish docs/relay/api-lane-s/runs/S1.md; classify the 23 API and 22 MM-Cron MRs, but do not touch production-lane MRs or run unapproved pipelines.
  • MWMC: start M1 and publish docs/relay/mwmc/runs/M1.md.
  • API Lane P: start P1 from 26 Oct; write the security enforcement LLD and preserve the high-risk approval gates.