MMDEP Assistant session log — 2026-10-21¶
Run: ATTENDED (phone PROCEED)¶
Result¶
- Read
control/HEARTBEAT.md,control/latest.md,control/harness/LATEST.md,docs/relay/answers.md,docs/agents/mmdep-agent-rules.md,docs/decisions/DR-012-three-process-flows.md(redirect notice),docs/adr/0012-three-process-flows.md, anddocs/registers/flags.md. - Confirmed the latest collector snapshot is timestamped 2026-10-21T03:50Z. It reports API last pipeline failed; 23 API MRs, 22 MM-Cron MRs, 56 MCRM MRs, 6 webapp-sakai MRs; staging
/categoryreturns 1 record versus 180 on production; API NAV for scheme 120245 has 3 duplicate dates and a 10-day gap;api.moneymarche.com/api/healthreturns 404. - Harness snapshot (2026-10-21T03:53Z) reports US$0.1918 month-to-date, eight open code items and none ready. Seven are in review and #24 is blocked; all were skipped by mode/state/scope gates, not executed.
- Relay answer confirms MCRM #118 is a technical decision: choose option A only after the evidence links prove G2-ARCH-08 and XP-01..XP-08 closure; then mark ASSUMED, remove
question-atul, and report paths to #113. - Prior PE #376 workbook inspection passed at exact head 700f65a6, but CSV exports and visual review remain before #309/#310 acceptance.
- Cross-repo business questions #123 (unknown deep MF route policy) and sandbox #27 (safe route-population source) remain in the collector snapshot. This Assistant did not edit those project issues because the decisions belong to WPDev/MWMC.
- Heartbeat file says active until 11:50 IST and runner online; this is the collector's last recorded state, not a fresh heartbeat.
Actions taken¶
- Committed the attended digest to
reports/reports/mmdep-assistant/2026-10-21-1101.md(commit7035cb64f72f1576673dbee582875b4b017e10d1). - Created durable knowledge files under
docs/knowledge/because the required files were missing onmainat the time of inspection. - No pipelines, terminal jobs, deployments, merges, production requests, or GitLab writes were performed. No claims of new implementation or fresh test execution are made.
Commands / tool actions¶
- GitHub connector reads of the paths listed above and the previous digest.
- Created documentation-only files and updated the Assistant's cursor on
reports; no shell commands were run.
Short reply¶
Run: ATTENDED — 21 Oct 2026. Digest committed. API NAV/data-health, staging category mismatch, and WIP backlogs remain the top flags. Harness spend $0.1918; no items ready. No pipelines or deployments run. Next: refresh only on new collector evidence and preserve the run cursor.
Run: ATTENDED (phone PROCEED) — 2026-10-21 20:30 IST¶
Result¶
- Freshly read the five required control sources: heartbeat, collector snapshot, harness latest, answers relay, and agent rules; also read the sprint plan, ADR-0012 process-flow decision, flags register, previous digest, current knowledge files, and Assistant cursor.
- Heartbeat/snapshot timestamp: 2026-10-21T14:53Z (20:23 IST); active until 22:53 IST and laptop runner online. The check-in-late flag remains set (last check-in 2026-10-20T15:39:18Z), so Assistant fallback applies.
- Current project queues: webapp-sakai 6 MRs (5 idle >14d), website 6, API 23 (last pipeline failed, 8 idle >14d), MM-Cron 22 (last pipeline failed, 6 idle >14d), MCRM 56 (46 idle >14d), Portfolio Engine 5, sandbox 4 (last pipeline canceled).
- Current harness snapshot (2026-10-21T14:56Z) reports US$0.1918 month-to-date. Seven of eight listed items were skipped by state/mode/scope gates; #24 is blocked. No new execution pass is recorded.
- Production API still has /api/health 404, three duplicate dates and a 10-day gap for scheme 120245 NAV, and ten duplicate dates in NIFTY 50 index NAV. Staging has health 200 but /api/schemes reports one record, index NAV 404, and active NFOs 500; staging scheme NAV ends 2026-08-19.
- TLS/DNS flags persist: dev hostname mismatch; wpdev, portfolio-engine-dev, mail, dashboard DNS/TLS failures. MMCLONE expires 10 Dec (49 days); main certs expire 13 Jan 2027 (83 days).
- Relay decisions still resolve WPDev #123 and sandbox #27 as technical choices, not Atul business questions. PE #329/#330/#375 direction and MCRM #118 evidence-gated ASSUMED path remain as previously relayed.
- Sprint 1 exact design → issues → preflight completion cannot be proven from the current five control sources; reported UNKNOWN, not assumed complete.
Actions taken¶
- Created digest:
reports/reports/mmdep-assistant/2026-10-21-2030.md, commit538e50cb3ea7b3fa397c64a0453f14ecf1ae256e. - Updating this session log,
docs/knowledge/CURRENT.md,docs/knowledge/OPEN-QUESTIONS.md, andreports/state/mmdep-assistant.jsonto preserve current facts and cursor. - No pipelines, terminal jobs, deployments, merges, production requests, or GitLab writes were performed.
Commands / tool actions¶
- GitHub connector fetches:
control/HEARTBEAT.md,control/latest.md,control/harness/LATEST.md,docs/relay/answers.md,docs/agents/mmdep-agent-rules.md,docs/plans/sprints-2026-10-18.md,docs/adr/0012-three-process-flows.md,docs/registers/flags.md,reports/mmdep-assistant/2026-10-21-0211.md,docs/sessions/2026-10-21.md,docs/knowledge/CURRENT.md,docs/knowledge/OPEN-QUESTIONS.md, andreports/state/mmdep-assistant.json. - Created the 20:30 IST digest on the reports branch. No shell commands were run.
Short reply¶
Run: ATTENDED — 21 Oct 2026, 20:30 IST. Digest committed; check-in is late although laptop heartbeat is ACTIVE. Harness spend $0.1918; no new pass, seven skipped and #24 blocked. API/staging data-health and WIP backlogs remain top flags. Next: act only on new evidence, audit current routing/preflight, and keep the run cursor current.